The Permit Office and the Dunn Museum, located at the General Offices in Libertyville will be closed Tuesday, December 24 and Wednesday, December 25 in...
The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
Concrete Block:
Insulate the concrete block walls of picnic shelter restroom at the Fox River Forest Preserve with Core – Fill 500. The Contractor is responsible for all material and labor to perform the work. The site must be prepped and installed per manufacturer instruction and at the location listed on the drawings. The Contractor is responsible for all cleanup. See A-4.1 for detail.
Closed Cell Spray:
Install JM Corbond III closed cell polyurethane foam insulation to the required r value in all the locations listed on the drawings at picnic shelter restroom. The contractor is responsible all 2x blocking listed on A3.1
The site must be prepped and installed per manufacturer instruction at the location listed on the drawings. The Contractor is responsible for all cleanup. See A-4.1