The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
Vendor o furnish all materials and labor to replace the existing Trane 4-ton SEER A/C Units and Trane 95% 120K furnaces with specified Carrier units or approved equivalent (See Attachment B)